SUB-BIDS REQUESTED
University of Oregon
Pacific Hall – South Wing
Lab Renovation
Phase 1 – Package 1B
Bids are Due to Andersen
Construction Feb. 22, 2017 at 2PM
Bid Package: #1B
Framing
Bid Documents are available to review and
download on Andersen’s Egnyte file. Below is a
link to the project documents.
100% CD – Package 1B – Framing - https://andersencloud.
egnyte.com/fl/7QPnvBk93N
Mandatory Pre-Bid Walk Through:
A mandatory pre-bid walk through is scheduled for
Thursday, 2/9/17 at 9:00am and will begin in the
Pacific Hall 1st Floor Lobby. Parking is limited on
campus, so please allow time to find parking.
All requests for clarification are to be submitted via
email to Dominic Puccinelli at dominic@andersen-<br<; a=""> />const.com and Emily Hager at ehager@andersen-<br<; a=""> />const.com. The cut-off date for all requests for
information (RFI’s) shall be February 13, 2017 at
5:00 PM.
All bids shall be submitted through email to the
contacts listed above or faxed to 503-283-3607
by February 22, 2017 at 2 pm.
Instructions for Andersen’s Prequalification Module
are posted on our Egnyte folder. (See address
above). All bidders must be prequalified or have
submitted their prequalification package prior to
submitting a bid
6712 N. Cutter Circle
Portland, OR 97217
Phone 503-283-6712
Fax (503) 283-3607
CCB # 63053
We are an equal opportunity employer and strongly
encourage the participation of emerging small business,
women-owned, disadvantaged, disabled veterans
and minority enterprises.

Oregon Lottery
Calendar

PHOTO GALLERY

Reed College Jobs
His Eye is on the Sparrow